We take on Goalstetter inground basketball goal/hoop assembly for homeowners in all of California. Every one of the 5 Goalstetter service options has a set price, from $485 to $985.
A starting-size build runs about 6 hours. Bigger models add time. What you pick is what you pay.
You can add anchoring, removal of an old unit, accessory installs, moving the boxes to the build spot and packaging haul-away when you book. It is one of our basketball hoop jobs, booked online and paid by card when the work is done.
You pay Zomg The Handyman only, by card, when the job is done. Never pay a technician directly; it voids the workmanship warranty. What you pick here is the price you pay. Any change needs your written approval first.
| Model or size | Price | |
|---|---|---|
| Any Goalsetter 72" Adjustable Height In-ground Residential Goalsetter Inground Basketball Goal/Hoop System Installation Services Our pricing includes the concrete, forms and any material (except for water) needed along with the two visits required for proper installation. | $985 | Book |
| Any Goalsetter 60" - 54"sized backboard system In-Ground Residential system Glass Backboard Models | $885 | Book |
| Goalsetter 72" Backboard Switch-out Service with a new backboard provided by the customer. | $685 | Book |
| Goalsetter 60-48" Backboard Switch-out Service with a new backboard provided by the customer. | $585 | Book |
| Goalsetter Jack (lift) Replacement Service with a new part provided by the customer. | $485 | Book |
| Stabilzer or Static Shot System | +$25 |
| Volleyball Trainer | +$65 |
| Solar or LED Basketball Hoop Light | +$135 |
| Yard Guard Assembly Service with new system | +$125 |
| Removal/Lowering of existing Pole & Backboard from the anchor kit. | +$385 |
| Not needed | included |
| Remove the existing Concrete Footer/J-Peg System (up to 18'wx48"D) from the ground for customer disposal. | +$685 |
| Concrete / Blacktop Cutting | +$450 |
| Not needed | included |
| The our crew will have to move the products boxes from another area of the property to the installation area. | +$135 |
| Not needed | included |
| The crew will remove all packaging and installation material waste (other than debris from the hole) and dispose of it offsite. | +$150 |
Removal of up to 12" of Existing Concrete Footer. We can not remove an entire existing concrete footing and reuse that hole for a new goal. The hole would have no structural integrity to properly support the new being installed. We normally use this process and dig a new hole to the the right or the left .
Choose this service if you would like you new goal set into an existing driveway/playing surface. Standard installation involves setting the concrete footer into soil directly outside of the playing surface. Zomg The Handyman is not responsible for and chipping or cracking to existing concrete or blacktop surfaces.
Should all packaging and installation debris be consolidated and left on site or do you want The crew to remove for offsite disposal. Note: Any debris from digging the hole for the footing will be piled within a few feet of the installation area, this debris must be left on site and can not be removed from the premises.
All underground utilities must be marked prior to technician arrival. If utilities have not been marked upon technician’s arrival, service will be rescheduled and a trip fee will be added to the total cost. Utility location is a free service offered by your local municipality, use https://call811.com/ .
I understand that I must have the goal location and alignment to the playing surface before the scheduled service appointment and to have all underground utilities located and marked marked prior to my appointment date. (Free Service https://call811.com/) I understand the Zomg The Handyman nor its crew are responsible for damage to sprinkler systems, phone or cable lines. Units can not be installed within 3' of any underground gas, electric or water utility markings. Wasted Trips because of yards not marked or things of this nature that keep us from completing the services for the visit are subject to additional charges from $195-$300.
To ensure a safe, successful, and timely installation, please review and agree to the following before scheduling service: 1. Utility Locating I understand I must have all underground utilities located and marked before my appointment date (Free service: call811.com). I understand our crew are not responsible for damage to sprinkler systems, phone, cable, or unmarked private lines. Units cannot be installed within 3 feet of underground gas, electric, or water utility markings. If my yard is not properly marked or site conditions prevent completion, I may be charged an additional $195–$300 wasted trip fee. 2. Order Modification Policy I understand that my order cannot be changed, modified, or updated within 48 hours of the scheduled arrival window. Requests to add or remove services inside this window must be approved in writing by Zomg The Handyman and may result in additional fees. Unapproved changes on the day of service may cause delays, partial completion, or additional charges. 3. Dirt & Debris Removal I understand that installation of the anchor system will create approximately two full wheelbarrow loads of dirt/debris. Zomg The Handyman will pile this material onsite (on a protective surface) but will not remove or spread it. I am responsible for disposal or use of this dirt. 4. Weather Conditions I understand that for safety reasons, services cannot be performed during unsafe weather conditions (rain, snow, lightning, winds over 10 mph, temperatures below 45°F or above 100°F, or other hazardous conditions). If weather prevents service, Zomg The Handyman will work with me to reschedule at no penalty. I agree to be flexible in rescheduling to ensure the safety of The crew and the quality of the installation. 5. Basketball System Installation Area Requirements (if applicable) I understand the anchor kit location must be clearly marked before Phase 1 installation, taking into account: Overhang of the backboard/unit Safe clearance from the playing surface Angles and positioning of the backboard Overhead lines, tree limbs, and underground obstructions (roots, rocks, etc.) The installation area must be: Clear of personal items, obstacles, and animal waste Accessible for equipment and materials I understand a large volume of dirt will result from digging the anchor hole and that I am responsible for its handling/disposal. Final Acknowledgment By placing my order, I confirm that I have read, understand, and agree to the above responsibilities. I understand that failure to meet these requirements may result in additional charges, delays, or incomplete service.
Pick your model above, book online in 60 seconds. All of California.
Book a licensed handyman anywhere in all of California in three taps, see upfront prices, track your pro and reach 24 hour support without a phone call.